Most people pick an inverter by asking a neighbour what they bought. That works until the day your air conditioning, water pump and iron are on together and the inverter trips. Sizing is really just two sums, and doing them properly takes about ten minutes.
Step one: add up what runs at the same time
An inverter is rated in kilowatts, and that number is about instantaneous load - how much you can run at once, not how long you can run it. Battery capacity decides the "how long"; that is a separate question we cover in sizing a battery bank.
So walk through the house and write down the wattage of everything you would want running during an outage. The rating plate on each appliance gives you the figure. Add them up.
Be honest about what is genuinely simultaneous. Every light in the house is rarely on at once, but an air conditioner, a fridge and a water pump very well might be.
Step two: leave headroom for start-up
Anything with a motor in it - air conditioner, refrigerator, water pump - draws several times its running wattage for the first moment it starts. A pump rated at 1,000W can pull a multiple of that for a second or two.
This is the single most common reason an inverter that looked big enough on paper keeps tripping. Add a margin above your total rather than sizing exactly to it.
Zing's IP66 inverters are rated to deliver peak output of up to twice their rated power for up to 15 seconds, which is what carries those start-up surges.
Step three: check the solar side separately
Here is the part people miss. The inverter's kW rating and the amount of solar it can accept are two different numbers, and they do not scale together.
- 6KW IP66 - up to 12,000W of PV input
- 8KW IP66 - up to 16,000W PV access power
- 10KW IP66 - up to 20,000W PV access power
- 12KW three phase - up to 24,000W PV input
- 15KW three phase - up to 30,000W PV input
If your roof can take more panels than your inverter can accept, you have bought capacity you cannot use. If the inverter accepts far more than you will ever install, you have paid for headroom you do not need. Size both together.
Single phase or three phase?
This one is decided for you by your electricity connection, not by preference. Most homes and small businesses in Pakistan are on a single-phase supply, and a single-phase inverter is the match.
Larger homes, factories and offices on a three-phase connection need a three-phase inverter. These also accept higher PV voltage - up to 1,000V across a 200-800V MPPT range, against 150-425V on the single-phase models - which means longer panel strings and less cabling on a big array.
If you are not sure which supply you have, your electricity bill or your meter will tell you.
What about switching time?
When the grid drops, there is a brief gap before the inverter takes over. If that gap is long enough, computers restart and routers reboot.
Zing's 6KW IP66 model has a UPS switching time under 10 milliseconds, which is fast enough that sensitive electronics do not notice the handover.
Where the inverter will live
Once you know the size, the remaining choice is the protection rating, and it is about location rather than performance. An inverter mounted outdoors needs sealing that one in a utility room does not. We cover this in what IP ratings actually mean.
A shortcut worth knowing
If all of this feels like more decisions than you want to make, an all-in-one system packages the inverter, the solar charge controller and the battery into one unit. You lose the freedom to size each part independently, and you gain a single box that arrives ready to install.
Still unsure? Tell us what you want to run and we will work through it with you.